Wednesday, October 27, 2010

What Is Appropriate To Wear To A Rush

Therme Vals 2 / 4


level bathroom with skylights, roof vents, and rhythms and shape of the roof slabs


level bathroom with stone floor pattern


floor, level with open area for therapy the public

29 Waiting areas
30 rest areas
31 Physiotherapy
32 Massage underwater
33 Massage
34 bed stretching
35 Fango
36 medicinal baths
37 Inhalation
38 Hydrotherapy bath 32 º C
39 Kitchen
Rest areas
40


floor: building services and therapeutic services

Waiting areas
29 30 31 Rest Areas
Physiotherapy Massage
32 33
underwater massage bed orthopedic

34 35 Fango Medicinal Bath

36 37 38 aquatherapy Inhalation
36 º 39 Kitchen
you
40 41
Storage Laundry cleaning toilets

42 43 44 Access Storage
Stairs
45 plants, underground facilities
46 flower bath

48 47 Chemicals elevator machine room

Power Plant 49 50 Water Treatment 51

sanitation Main Installation Installation of air conditioning 52 53 Carbonic acid
Installing fire

54 55 56 Ozone treatment
sanitation secondary Installation
57
freshwater tank sewage tank 58



floor, bathing

1 Zone Input and output
2 Laundry
3 Room makeup
4 room with drinking water sources
5 Dressing
6 showers
7 Rest areas
8 showers and Turkish chambers of sweat 42 º C
9 Bath interior 32 º C
10 Bath Outdoor 36 º C
11 Island stone
12 stone terrace
13 Cave Spring 36 º C
14 Outdoor pool 42 ° C
15 Cold bath 14 º C
16 stone shower
17 Drinking water
18 Stone sounds
19 flower bath 30 º C
Rest room 1 20 21
outside stone shower room
22 break 2
Massage
23 24 3 Rest room Rest room
25 4
Wardrobe
26 28 27 Entry Assistants bathroom




Plant implementing floor


implementing Section


Longitudinal sections




cross sections
map detail: Skylight - glass joint


map detail: Skylight on indoor


map detail: Flower Bath

0 comments:

Post a Comment